RSCS Programme overview
Thursday, 26 June 2008: Systems Engineering
Chair: Jerry Morling, Network Rail
| 08:45 |
Introduction / Overview |
| |
|
| 09:00 |
System Requirements Management
Andy Bourne, Systems Engineering Manager, JNUP Project Team, Tubelines
|
| |
- The importance of managing requirements
- Sources of Requirements
- Requirements in the System Lifecycle
- Requirements Management Tools
- Pitfalls to Avoid
|
| 09:50 |
An Introduction to Engineering Safety Management
Peter Sheppard, Principal Consultant, Lloyd's Register Rail
This presentation will: |
| |
- Give the student a basic understanding of Engineering Safety Management
- Help them understand the difference between a Causal Factor, Hazard and Accident
- Make them aware of the risks involved in making a change to the railway and how to control them
|
| 10:40 |
Refreshments |
| |
|
| 11:00 |
Electrical Integration and Interface Management
Roger White, Professional Head of Electrification, Atkins |
| |
- Railway Electrical Systems Integration
- Management of Systems Integration
- Management of Electromagnetic Compatibility
- Interface Management
|
| 11.25 |
Physical Interfaces and Vehicle Track Interaction
Brian Clementson, visiting Professor, Newcastle University and Consultant
|
| |
- Physical and contractual interface conflicts.
- Wheel/rail interface
- Wheel and track profiles
- Vehicle curving and track geometry
- Vehicle structures and suspensions
|
| 11:50 |
Human Factors
Dr Amanda C Elliott, Human Factors Delivery Manager, SSL Upgrade and Director, Innovace Designs Ltd
|
| |
- Human Factors for Railway Signalling and Control Systems
- To describe the role of Human Factors (HF) in the railways, what it is and why it is important
- To outline some HF principles for signalling and controls systems
- To describe the process of Human Factors Integration, using practical examples
|
| 12:40 |
Lunch |
| |
|
| 13:40 |
The Operator's View
Wallace Wetherill, Southeastern Railway |
| |
|
| 14:30 |
Systems Integration
Jon Elphick, Head of Systems Engineering, Atkins |
| |
|
| 15:20 |
Refreshments |
| |
|
| 15:40 |
Handover to Maintenance
Stewart Mills, Tubelines
|
| |
|
| 16:30 |
Review session |
| |
|
| 16:45 |
End of formal session |
| |
|
| 18:00 |
Social Visit and supper at Midland Air Museum |
| |
|